Hi all
I've just used drywall adhesive to fill some quite large areas in between a worktop and window before tiling. Its an inch deep in some parts, about half a metre wide, 15CM high. How long will I have to wait for it to dry out before I can tile over it?
Also, should I use a primer before tiling over this?
Thanks
Read more: //www.diynot.com/diy/threads/drywall-adhesive-used-as-a-filler.225715/#ixzz4DMRC3hUO
I've just used drywall adhesive to fill some quite large areas in between a worktop and window before tiling. Its an inch deep in some parts, about half a metre wide, 15CM high. How long will I have to wait for it to dry out before I can tile over it?
Also, should I use a primer before tiling over this?
Thanks
Read more: //www.diynot.com/diy/threads/drywall-adhesive-used-as-a-filler.225715/#ixzz4DMRC3hUO