I called an electrician in yesterday to quote to replace the cabling running to an electric shower. When he arrived he did a lot of sucking through teeth and told me that he couldn't do the work until all the earth bonding was right. This included the bonding to the stop cock and the gas meter and presumably anything else he finds.
Is it "normal" for him to insist on all the earth boding work being completed before he runs the cable or does it sound like work creation?
A supplemental and related question:
The stop cock was connected to earth via a large brass terminal block with 4 other 4mm earth cables into it (running from the sink pipes etc). Is that the bodge it sounds like?
Is it "normal" for him to insist on all the earth boding work being completed before he runs the cable or does it sound like work creation?
A supplemental and related question:
The stop cock was connected to earth via a large brass terminal block with 4 other 4mm earth cables into it (running from the sink pipes etc). Is that the bodge it sounds like?