Any building regulations for the SWA cable in trench entering brick foundation wall to a bungalow, 600mm below ground finished level. There is about 1m clearance depth to soil level below floorboards, cable will be at 400mm down from floorboards.
Probably needs a plastic sleeve extending 100mm each side. Sealing requirements if permissible? The incoming water and gas pipes are within plastic pipes at soil depth, rising vertically upwards, these are both sealed at entry.
Regards
Probably needs a plastic sleeve extending 100mm each side. Sealing requirements if permissible? The incoming water and gas pipes are within plastic pipes at soil depth, rising vertically upwards, these are both sealed at entry.