Hi
Does anyone have a lead to a reference document stating what constitutes engineering works?
I am trying to ascertain if excavating to level a base for a detached garage under PD requires PP
Or conversely does building up ground to level a site constitute engineering works?
Alternatively can I just build stepped foundations and build a taller wall to get the site level assuming I stay within PD regs for detached buildings etc.
Any information or advice gratefully received....I have been following other posts on detached garage foundations but I am still unclear as to the actual definition of 'engineering works'
Thanks in advance
tp
Does anyone have a lead to a reference document stating what constitutes engineering works?
I am trying to ascertain if excavating to level a base for a detached garage under PD requires PP
Or conversely does building up ground to level a site constitute engineering works?
Alternatively can I just build stepped foundations and build a taller wall to get the site level assuming I stay within PD regs for detached buildings etc.
Any information or advice gratefully received....I have been following other posts on detached garage foundations but I am still unclear as to the actual definition of 'engineering works'
Thanks in advance
tp