Hi. I'm currently converting a 3 bed property into a 6 bed all ensuite hmo. Two are on the 1st floor which im raising from a single storey of an annexe.
(EXTENSION) above the annexe. 3 x which will be on 1st floor of main 3 bed house two of which will be part of the rear 2storey extension at the back and part of the extension to the 2 rear bedrooms the 5theensuite will be on the 1st floor at the front of the house and will be converting the small front bedroom into an ensuite. The 6th ensuite will be part of the new bedroom to the front of the ground floor. My question is do I need any planning for any of this? Just had my plans for the extensions passed today (after 6 months!!) but they do not incorporate the ensuites just 2 x separate bathrooms on 1st floor. I know I have to have building regs involved. But was also led to believe that I'd have to gave planning for the en suites if they were .... 1. In a listed building.( which its not) and here's my worry. ... as part of an extension. Can anyone tell me if I have to have a. New plans drawn and planning on them or just maybe new plans drawn for building regs purposes? OR neither?
(EXTENSION) above the annexe. 3 x which will be on 1st floor of main 3 bed house two of which will be part of the rear 2storey extension at the back and part of the extension to the 2 rear bedrooms the 5theensuite will be on the 1st floor at the front of the house and will be converting the small front bedroom into an ensuite. The 6th ensuite will be part of the new bedroom to the front of the ground floor. My question is do I need any planning for any of this? Just had my plans for the extensions passed today (after 6 months!!) but they do not incorporate the ensuites just 2 x separate bathrooms on 1st floor. I know I have to have building regs involved. But was also led to believe that I'd have to gave planning for the en suites if they were .... 1. In a listed building.( which its not) and here's my worry. ... as part of an extension. Can anyone tell me if I have to have a. New plans drawn and planning on them or just maybe new plans drawn for building regs purposes? OR neither?