I was just going to get a maint free jb, but the join is inside studwork, so I suspect it's a no-no.
Any advice? It wouldn't actually kill me to run a new 10mm cable to the CU, but a join would be easier short term, not least because the existing cable already goes through the pull cord.
Thanks.
Any advice? It wouldn't actually kill me to run a new 10mm cable to the CU, but a join would be easier short term, not least because the existing cable already goes through the pull cord.
Thanks.
Last edited:
