This is my driveway, the raised area of garden that is sticking out with the palm trees in it I want to remove and concrete to increase the functionality of the driveway.
I don't know the process for this though.
Obviously remove mud, trees and brick work, whack some shuttering in to stop the rest of the mud falling.
I'm assuming the concrete needs to be 100mm thick laid on to type 1 which has been whacked, but how deep do I dig for type 1, do I need sand..
It is the build up I don't understand, may I have some guidance please...
I don't know the process for this though.
Obviously remove mud, trees and brick work, whack some shuttering in to stop the rest of the mud falling.
I'm assuming the concrete needs to be 100mm thick laid on to type 1 which has been whacked, but how deep do I dig for type 1, do I need sand..
It is the build up I don't understand, may I have some guidance please...