Hi all come to build my extension done the footings etc to make my drains work I need to bring the extension in a course off brick 225mm smaller
I’ve planning accepted for 5165 but that puts me slap bang into the centre of my cavity and won’t work for my drain issues It has to be 4940. I want to do this correct do I just do a small amendment on planning think it’s called and send them
My new dimension or do I have to have all new drawings done basically my extension has 225 step in now but then will have 450 step in instead
I’ve planning accepted for 5165 but that puts me slap bang into the centre of my cavity and won’t work for my drain issues It has to be 4940. I want to do this correct do I just do a small amendment on planning think it’s called and send them
My new dimension or do I have to have all new drawings done basically my extension has 225 step in now but then will have 450 step in instead