D.Hailsham has been very kindly helping me out with a dilema of mine.
Unfortunately I need one last question answering but sadly he is not online at the moment, and I am kind of stuck in limbo.
Would you be kind enough to answer this question for me ?
"What does the highlighted quote at the bottom of the page mean" ?
Disconnect everything from the junction box including links between terminals and wire up as follows:
JB = Junction Box
Mains Input
Live : JB 1
Neutral: JB 2
Earth: JB 3
Tempus 1
Live: JB 1
Neutral: JB 2
1 Com: Link to Live in the Tempus 1
2 Off: JB 7
3 On : JB 6
HW Thermostat
C: JB 6
1: JB 8
2: JB 7
Digistat
Link JB 1 to JB 4
C: JB 4
On: JB 5
Honeywell Valve
White: JB 5
Grey: JB 7
Blue: JB 2
Green/Yellow: JB 3
Orange: JB 8
Pump
Live: JB 9
Neutral: JB 2
Earth: JB 3
Note: the Pump gets its Live connection from the Boiler PL terminal via JB 9. This in accordance with mfr instructions.
Boiler
Live: JB 1
Neutral: JB 2
Earth: JB 3
Link JB 8 to JB 10
Switched Live (SL): JB 10
Pump Live (PL): JB 9
Many thanks
Ian
Unfortunately I need one last question answering but sadly he is not online at the moment, and I am kind of stuck in limbo.
Would you be kind enough to answer this question for me ?
"What does the highlighted quote at the bottom of the page mean" ?
Disconnect everything from the junction box including links between terminals and wire up as follows:
JB = Junction Box
Mains Input
Live : JB 1
Neutral: JB 2
Earth: JB 3
Tempus 1
Live: JB 1
Neutral: JB 2
1 Com: Link to Live in the Tempus 1
2 Off: JB 7
3 On : JB 6
HW Thermostat
C: JB 6
1: JB 8
2: JB 7
Digistat
Link JB 1 to JB 4
C: JB 4
On: JB 5
Honeywell Valve
White: JB 5
Grey: JB 7
Blue: JB 2
Green/Yellow: JB 3
Orange: JB 8
Pump
Live: JB 9
Neutral: JB 2
Earth: JB 3
Note: the Pump gets its Live connection from the Boiler PL terminal via JB 9. This in accordance with mfr instructions.
Boiler
Live: JB 1
Neutral: JB 2
Earth: JB 3
Link JB 8 to JB 10
Switched Live (SL): JB 10
Pump Live (PL): JB 9
Many thanks
Ian