I had a problem with some Fitzgerald lay in lights - integral fuse holders melting!!!
In the end their engineers came up and replaced them - all day job, 2 men for 26 fittings came from down South to do it (why not just get a local guy to do it for them!!)
In the end their engineers came up and replaced them - all day job, 2 men for 26 fittings came from down South to do it (why not just get a local guy to do it for them!!)
