I've build some garage steps, and I'm ready to lay the pavers. The risers will consist of two 300x450mm pavers, and the top will be 4 square pavers. As you can see in the photo, there are some small gaps between the aeriated concrete blocks (these sit on top breeze blocks)
My question: Do these gaps need filling with rubble/mot/etc so I can lay the pavers onto a solid bed?
My question: Do these gaps need filling with rubble/mot/etc so I can lay the pavers onto a solid bed?

