Filling the gap between bricks up to DPC level

Joined
30 May 2010
Messages
1
Reaction score
0
Location
Lancashire
Country
United Kingdom
What is the best mixture to use to fill in the cavity between inner and outer bricks on the external wall up to DPC level, before the trench is filled with stone?
Some say mix 10 parts sand 2 parts cement and 10mm limestone.
until pourable then pour this into the gap.
Others have used a dry mix of the above?
Any advice
 
Sponsored Links
We normally use a lean concrete mix of all in ballast and OPC. Don't go right up to the DPC.
 

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Sponsored Links
Back
Top