Can anyone help.
I'm converting a room upstairs to a bathroom (shower, toilet hand basin). The toilet waste pipe will be 5 feet long before it hits the vertical soil stack. The fall is potentially 8 inches over 5 feet.
Question 1 - is this OK?
I also want to run the washbasin and shower waste pipe into the soil stack.
Question 2 - Could I intercept the toilet waste pipe or do I have to join the shower and washbasin waste pipes onto the vertical section of the soil pipe.
Thanks in advance
Bill
I'm converting a room upstairs to a bathroom (shower, toilet hand basin). The toilet waste pipe will be 5 feet long before it hits the vertical soil stack. The fall is potentially 8 inches over 5 feet.
Question 1 - is this OK?
I also want to run the washbasin and shower waste pipe into the soil stack.
Question 2 - Could I intercept the toilet waste pipe or do I have to join the shower and washbasin waste pipes onto the vertical section of the soil pipe.
Thanks in advance
Bill