- Joined
- 18 Oct 2005
- Messages
- 32
- Reaction score
- 0
- Country
Hi all.
I am about to fit a 900mm stonecast quad shower tray. It''s the type that comes with legs (merlin) for raising it on concrete floors for the waste. Do I install it on the legs alone or should it also have a concrete bed under the main part of the tray to spread the weight too?
I am about to fit a 900mm stonecast quad shower tray. It''s the type that comes with legs (merlin) for raising it on concrete floors for the waste. Do I install it on the legs alone or should it also have a concrete bed under the main part of the tray to spread the weight too?