I am about to fix a 1200x900 Stone Resin Tray in a first floor Bathroom. It states on the tray that this should be bedded on a sand & cement mix- but as this is on the 1st floor it would be on Floorboards rather than an existing concrete floor. What if I was to fix this with Gripfill - its so Bloody Heavy I cant see it moving!