Hi all
Had liquid cement with fibres screed poured on Wednesday this week. Avoided walking on it and all doors ect closed for 2 days, then fx followed advice to now get lots of fresh air moving over it.
Dpm, insulation, vapour layer, then this layer, c50mm.
I walked on it earlier, and very top layer, I guess 1mm maybe less, in places a bit flaky / not set. Also odd non straight crack but they see thin.
This normal? I was told so by screed guys cracks normal, and to on day 7 even though its cement screed, still a wire brush will help over top to give a key before tiles go down on day 22.
See photos.
Maybe just me as never had this stuff before but if anything I can do now, rather than wait useful to know
Had liquid cement with fibres screed poured on Wednesday this week. Avoided walking on it and all doors ect closed for 2 days, then fx followed advice to now get lots of fresh air moving over it.
Dpm, insulation, vapour layer, then this layer, c50mm.
I walked on it earlier, and very top layer, I guess 1mm maybe less, in places a bit flaky / not set. Also odd non straight crack but they see thin.
This normal? I was told so by screed guys cracks normal, and to on day 7 even though its cement screed, still a wire brush will help over top to give a key before tiles go down on day 22.
See photos.
Maybe just me as never had this stuff before but if anything I can do now, rather than wait useful to know