Afternoon,
First up I am a basic DIY guy looking for some expert advice.
I have an existing concrete slab in my garden which I know has been installed correctly with dpm etc and on top of the slab I am planning building a man cave for a games room. The cave will be timber framed with timber cladding that slightly overhangs the existing slab and my thought was to install timber battens on top of the slab with kingspan/celotex insulation between the battens also directly on the slab. On top of the battens I was then thinking 22mm chipboard.
My question is does my flooring idea of timber battens and insulation installed directly on the concrete slab recommended?
Many thanks to anyone who posts a reply.
First up I am a basic DIY guy looking for some expert advice.
I have an existing concrete slab in my garden which I know has been installed correctly with dpm etc and on top of the slab I am planning building a man cave for a games room. The cave will be timber framed with timber cladding that slightly overhangs the existing slab and my thought was to install timber battens on top of the slab with kingspan/celotex insulation between the battens also directly on the slab. On top of the battens I was then thinking 22mm chipboard.
My question is does my flooring idea of timber battens and insulation installed directly on the concrete slab recommended?
Many thanks to anyone who posts a reply.