footings

Joined
22 Dec 2007
Messages
2
Reaction score
0
Location
Flintshire
Country
United Kingdom
im building an extension and my depth of footing will be 900mm in clay. the existing house footing is only 400mm also in solid clay i was wondering do i have to dig under existing footing and fill with conc or just go up to it cheers
 
Sponsored Links
most bco's in Staffs require a slight underdig, providing an underpin to the existing.
 
The BCOs around here don't.

You would only be asked to do it if the existing is a traditional stepped brick footing, in which case the ground under the step is removed to take the new foundation plumb with the external face of the existing building.
 

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Sponsored Links
Back
Top