Hello,
Anyone out there that can help me?
Structural engineer said “You need to fix frame cramps to the face of the hatch brickwork at 150mm and 450mm above the bottom of the hatch, the cramps plugged and screwed to the existing brickwork”
where my vertical black line is there use to be a hatch.
Do I just need to knock down the brickwork I’ve just done. Re-do the same way but plug and screw frame cramps in..
Getting confused as doesn’t feel right to have a vertical mortar line. Or is it okay as frame cramps are holding it in.
Thanks
Anyone out there that can help me?
Structural engineer said “You need to fix frame cramps to the face of the hatch brickwork at 150mm and 450mm above the bottom of the hatch, the cramps plugged and screwed to the existing brickwork”
where my vertical black line is there use to be a hatch.
Do I just need to knock down the brickwork I’ve just done. Re-do the same way but plug and screw frame cramps in..
Getting confused as doesn’t feel right to have a vertical mortar line. Or is it okay as frame cramps are holding it in.
Thanks