I'd like to replace a roof and put rooflights in, on a old garage type building.
I see on my councils website that I could do this on a building notice.
In the next few months I'd like to replace the windows and add a door, sort out a new floor... long term thought, possibly change of use.
I presume that BCN would have to be applied for with every item I wanted to do when I get around to it.
With FPS, it's not clear on the councils website, when it comes to 'inspection fee' (£5-25k)
Is this a one off fee/inspection or each time its needed.
Would the FPS be a better/worse option? How long do these take to organise?
Thought I'd ask here before getting through to our council.
TIA
I see on my councils website that I could do this on a building notice.
In the next few months I'd like to replace the windows and add a door, sort out a new floor... long term thought, possibly change of use.
I presume that BCN would have to be applied for with every item I wanted to do when I get around to it.
With FPS, it's not clear on the councils website, when it comes to 'inspection fee' (£5-25k)
Is this a one off fee/inspection or each time its needed.
Would the FPS be a better/worse option? How long do these take to organise?
Thought I'd ask here before getting through to our council.
TIA