Appreciate this has probably been addressed before, but planning a garden room at some stage and plan to build up to floor height in masonry and pour slab ending up 150mm above outside ground level. Then build timber frame on top, osb, cladding etc, and stick within the max 2.5m eaves height with a flat roof. When chatting to others about doing a few courses of brickwork for the base, I seem to get blank looks. Does anyone actually do it this way? For me it makes sense and you’ve got your nice insulated slab and neat brick plinth as for a traditional masonry build.
Also how’s the timber frame attached to the dpc brickwork, bolted? Or something set into concrete?
Cheers!