Hello everybody,
I was wondering if you could all help in clearing something up for me please.
The gas people have all been renewing the mains up at my Grandmas house, they have done this and spotted a leak inside and capped it off. They said this was common when the majority of pipework is still in lead.
I have had two people out on my grandmas behalf for quotes that were similar in price but different in ideas. I will explain what gas appliances we have , 2 gas fires, 2 wall heaters, 1 oven, 1 hob.
I have been advised that it will be 25 - 30 metres of pipework to connect to all of these appliances from the meter.
The first engineer advised that he would run from the meter in 22mm upstairs under the floor, and then come off in 15mm to the wall heaters, downstairs to gas fires, and also hob and oven.
The second engineer advised it would need 2 22mm pipes run from meter to half of the appliances each.
By the two different responses i am confused as to who is right.
Please can someone advise as to which is the right way, or are both ok.
As you all can appreciate i no nothing about this and want it done right for my grandma.
thanks
I was wondering if you could all help in clearing something up for me please.
The gas people have all been renewing the mains up at my Grandmas house, they have done this and spotted a leak inside and capped it off. They said this was common when the majority of pipework is still in lead.
I have had two people out on my grandmas behalf for quotes that were similar in price but different in ideas. I will explain what gas appliances we have , 2 gas fires, 2 wall heaters, 1 oven, 1 hob.
I have been advised that it will be 25 - 30 metres of pipework to connect to all of these appliances from the meter.
The first engineer advised that he would run from the meter in 22mm upstairs under the floor, and then come off in 15mm to the wall heaters, downstairs to gas fires, and also hob and oven.
The second engineer advised it would need 2 22mm pipes run from meter to half of the appliances each.
By the two different responses i am confused as to who is right.
Please can someone advise as to which is the right way, or are both ok.
As you all can appreciate i no nothing about this and want it done right for my grandma.
thanks