I was at the vets today and the place is being rewired, and I see that they've pulled the twin and earth past the skirting boards without removing or cutting the skirting boards. You know, to get the cable from under the floor board to above the skirting board where it is then chased in the wall to the socket.
From what i can see, but I'm not certain, they've taken a long SDS drill bit and drilled at an angle from the wall above the skirting board towards the floor. It won't be directly down because the drill wont clear the wall to be at 90 degrees.
Is this the way it's done?