Getting grid switches installed. Spark from work is coming to test and put together but im doing donky work. Its going to operate cooker hood, hob and maby plinth and pelmet led lights. And the other side of room for washing machine and dryer.
The plinth and pelmet lights will either be connected from a spur intoa 3 amp fsu where it becomes 1mm then up to a 2 gang llight switch then down under floor ( if can get access) to other wall where it goes into a socket for pelmet then 1mm up to a double socket where it does the cabinet lights . Lights have transformers and output is 0.5 and 1.0. .
If can't get under floor it will get run of grid switch . On that wall there is two 32 circuits . One has 4 mm cable into a socket then a ring of 2.5mm feeding 2 double sockets and a spur. But now getting replaced with 3 double sockets. 3 singles . The grid switch will be servicing the 3 singles. Mk double poles will be used . And ran to the devices thro a fcu with appropriate fuse rating. Cpc will be reinstated to all sockets on that cable. Then back to the first socket. Spark is going to upgrade my cu when here
The plinth and pelmet lights will either be connected from a spur intoa 3 amp fsu where it becomes 1mm then up to a 2 gang llight switch then down under floor ( if can get access) to other wall where it goes into a socket for pelmet then 1mm up to a double socket where it does the cabinet lights . Lights have transformers and output is 0.5 and 1.0. .
If can't get under floor it will get run of grid switch . On that wall there is two 32 circuits . One has 4 mm cable into a socket then a ring of 2.5mm feeding 2 double sockets and a spur. But now getting replaced with 3 double sockets. 3 singles . The grid switch will be servicing the 3 singles. Mk double poles will be used . And ran to the devices thro a fcu with appropriate fuse rating. Cpc will be reinstated to all sockets on that cable. Then back to the first socket. Spark is going to upgrade my cu when here