Ground floor DPM nightmare... what to do?!

hi @dazlight where you say "use a good vapour underlay" do you mean just do this without digging up the floor and doing the 2x10kg again (they basically didn't put enough down)?
And do you mean MVS/fball F78 / F77 over what's there atm OR dig up and start again? (knowing we can't go much higher with what's there atm...
 
Fill any holes , f78 3 coats , then underlay, timbermate excel or similar

No need to dig it all up.
 
@dazlight @crazydaze

have discussed with the company and we think a solution might be to bash out any bossed bit and fill.
Do another 20kg Ardex DPM1 over whole space and another layer of Ardex NA.
Around the external door we frame in a low lying doormat, and at the other 5 opening we will have to have some sort of profile to that there's not a 20mm step.....
Anyone see any issues with this?
Or are we definitely better to take it all up and start again??
 
Sorry @all - a slight spanner in the works... just realised that the 'feathering' they used on top of the top layer of Ardex NA to fill in holes is pretty rough (pics attached) - I don't think they'll be able to do the Ardex DPM on this very well (though I could be wrong) - getting into all the nooks and crannies? I think we might have to revert to taking the whole thing up and starting again so that the DPM at least goes onto a CLEAN and FLAT surface... any thoughts to the contrary?
 

Attachments

  • 20260903_093237.jpg
    20260903_093237.jpg
    383.1 KB · Views: 17
  • 20260903_093331.jpg
    20260903_093331.jpg
    199.1 KB · Views: 24
  • 20260903_093353.jpg
    20260903_093353.jpg
    245.9 KB · Views: 18
Update - so we've dug up the top later (ardex sandwich done wrong) and found a lot of patches where the original sand cement from 18 months ago is very friable (in a few places we can get down to the cement below about 80mm). Some areas seem okay however. The room has been sheeted and insulated etc so we can't dig whole thing out to get to the walls - one suggestion was to do this and do a whole new pour - BUT we'd have to cut up against the new plasterboard and I worry this would weaken where the framing sits. Other option is to repair what we have. Any ideas??!
 

Attachments

  • 1000082067.jpg
    1000082067.jpg
    586.4 KB · Views: 7
  • 1000082078.jpg
    1000082078.jpg
    410.4 KB · Views: 7
We have gone over weak sub floors like that a few times. I did a video / picture thing on you tube of one we did.
Works well.

You could use a few types of penetrating epoxy primers
Fball SRS
Uzin PE425
Ardex PSRS

 

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Back
Top