Have 1000mm deep trench excavated in prep for full fill of concrete. The groundworker is of the opinion the fill must stop 100mm below ground level at the highest - however, I used this method once before and filled right up to ground level, the bco didn't complain. Has something changed in the regs or is the groundworkers knowledge lacking?
I would like to fill up to ground level because it finishes bang on with a mortar joint on the existing structure.
I would like to fill up to ground level because it finishes bang on with a mortar joint on the existing structure.