Pretty much as the title says, I'm having a boiler installed on Monday onto a lath and plaster wall. I took down a kitchen unit to make way for it and noticed that the plaster has seen better days.
Is the most likely method to span a couple of studs with plywood etc? If so I think I'll need to take down another couple of units.....
How have you guys gone about doing this in the past?
Probably not too relevant but its a WB junior (pretty light in boiler terms?)
Thanks,
Ron
Is the most likely method to span a couple of studs with plywood etc? If so I think I'll need to take down another couple of units.....
How have you guys gone about doing this in the past?
Probably not too relevant but its a WB junior (pretty light in boiler terms?)
Thanks,
Ron