• Looking for a smarter way to manage your heating this winter? We’ve been testing the new Aqara Radiator Thermostat W600 to see how quiet, accurate and easy it is to use around the home. Click here read our review.

How long after screed to lay shower tray.

Joined
17 Jun 2014
Messages
63
Reaction score
1
Location
Lancashire
Country
United Kingdom
Hi,
I have just poured some Mapei Ultraplan 3240 self leveller down to level the floor prior to fitting a shower tray. It says that it is walkable after 4-5 hours, does that mean I can install the shower tray after 4-5 hours or do I have to wait for the leveller fully cure first?
Thank you!
 
Walkable is set but not dry.
Means you can carry on but don't go digging or scratching. It's not fully hardened but you can stand on it or walk on at exit or entrance as an example.
 

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Back
Top