I'm about to have a stab at laying a limestone patio this weekend; just over 15 square metres.
All the hardcore is in place, and compacted. But how do I work out how much mortar I'll need to make up. And what should the mix be? Someone told me: -
2 cement
2 building sand
12 sharp sand
Don't want to be a scruff and be left with a dumpy bag on the front lawn! but also want enough to do the job!