THere's a lot of conflicting information on hte web, but how does this sound?
Dig out 10cm deep all round
Put driveway control sheet down
Compact 5cm of scalpings over driveway
Add 5cm of 20mm gravel to top
Are the scalpings necessary as if I leave them out, what's likely to happen? It is after all a gravel driveway so surely nothing much
Is a ground control sheet necessary if I do use scalpings?
Thanks in advance folks
Dig out 10cm deep all round
Put driveway control sheet down
Compact 5cm of scalpings over driveway
Add 5cm of 20mm gravel to top
Are the scalpings necessary as if I leave them out, what's likely to happen? It is after all a gravel driveway so surely nothing much
Is a ground control sheet necessary if I do use scalpings?
Thanks in advance folks