Hi, I want to put up 2 layers of 12.5mm plasterboard on a party wall. I'm not sure if to/how to, stagger the screws. Do I screw the first board in every 20-30 cm and then do the second one on top the the same frequency OR do I put enough to hold the first in place then then screw both layers together every 20-30 cm? Thanks.