The shower tray that we have to install in an angle is so heavy that we need 2 persons pushing it on the floor to put it in place.
How can we in that condition put the cement on the floor and then the tray on top without spreading the concrete all over the place. It will be a mess. There must be a technique.
How do we do?
Thanks.