- Joined
- 10 Jul 2004
- Messages
- 15,732
- Reaction score
- 6,157
- Country

Looking on page 28 far right paragraph, I am having trouble understanding how it says " if the boiler is supplied by 28mm pipe, runs 1-2 2-4 and 22mm tube for 4-6 the re-worked pressure drops are 0.18 + 0.13 + 0.17 =0.48mb" I am not seeing this on the chart, am I missing something ?
Last edited by a moderator: