- Joined
- 23 Jan 2023
- Messages
- 85
- Reaction score
- 0
- Country
Hi all,
First time laying Indian sandstone.
Laid on a 4/1 mix of sharp sand. Semi wet mix. SBR and cement slurry on the bottoms. Laid on a 50mm full bed. Lifted one and can see that they have been laid perfectly on a full bed or mortar.
After 48hrs the slabs have a slight hollow sound when I knock on them. Is this due to the bed not being fully dry yet or does it sounds like a installation error?
Thanks
First time laying Indian sandstone.
Laid on a 4/1 mix of sharp sand. Semi wet mix. SBR and cement slurry on the bottoms. Laid on a 50mm full bed. Lifted one and can see that they have been laid perfectly on a full bed or mortar.
After 48hrs the slabs have a slight hollow sound when I knock on them. Is this due to the bed not being fully dry yet or does it sounds like a installation error?
Thanks