I going to build a conservatory and I have a 300 diameter inspection chamber in my garden. It will be in the floor of the conservatory. Shall i move it a metre or so out of the range of the conservatory or can i build my slab over the top. If I do this wiil i need to fit some kind of access lid over it for any future inspections??