installation of Bathroom suite

Joined
6 Nov 2007
Messages
1
Reaction score
0
Location
Yorkshire
Country
United Kingdom
HI

How long on average does it take to install a bath, shower cubical and basin with a toilet and a radiator.

All the plumber has to do is Cap the pipes and then our builder to take old bathroom out and take the bathroom back to brick for a total rebuild, then the plumber will then re-pipe and install when walls have be plastered.

please advise - (its not a very large bathroom) (please advise in your response if you are a plumber or not)

Thanks

Regards
Richard Barnett
 
Sponsored Links

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Sponsored Links
Back
Top