I've achieved planning permission to seperate part of my house, so I want to get the ball rolling and sort the electricity.
This section of house will be rented out and the new tenants will be responsible for paying their bills.
Is it possible to have two meters in one electricity cupboard? Then run the sub-main cable through my house (15-20meters) to the new consumer unit.
Also what size cable would be required? so I can get an idea of costs. As a rough guide the demand will be...
x 2 Dimplex DuoHeat 2.6KW
x 2 Dimplex Panel Heaters 2.0KW
x 1 Towel Rail 400Watt
x 1 Immersion supply 3.0KW
x 1 Electric Shower 9.0KW
x 1 Electric Cooker
x 2 Radial Circuits
x 2 Lighting Circuits
Thank You
This section of house will be rented out and the new tenants will be responsible for paying their bills.
Is it possible to have two meters in one electricity cupboard? Then run the sub-main cable through my house (15-20meters) to the new consumer unit.
Also what size cable would be required? so I can get an idea of costs. As a rough guide the demand will be...
x 2 Dimplex DuoHeat 2.6KW
x 2 Dimplex Panel Heaters 2.0KW
x 1 Towel Rail 400Watt
x 1 Immersion supply 3.0KW
x 1 Electric Shower 9.0KW
x 1 Electric Cooker
x 2 Radial Circuits
x 2 Lighting Circuits
Thank You