I need to run hot/cold supply+waste+electric to kitchen island.
Currently got a level concrete floor and am planning 75mm insulation/UFH/ 65mm screed.
As its level I am planning on using a Saniviye pump for waste.
Whats the best way to achieve this?
I found this link but wondered if anyone had a better suggestion.
http://www.ukselfbuild.com/content/view/70/44/
Thanks for Advice