Hi there

I'm investigating how long it takes a insulated concrete floor to dry. Is there guidance around X days per cm thickness? I want to ultimately lay vinyl tiles over the top so would need a screed over the top of the concrete. Is it possible to lay a screed over the top of the concrete when it isn't fully cured and then lay the vinyl after the floor has fully cured? At least that way I can install kitchen units whilst the floor is still curing and lay the vinyl afterwards.

Many thanks
 