Hi There, this is my first post .... so please be gentle
I have nearly finished building a double dormer tiled with Marley plain tiles - one of the most laborious jobs in history. For the remaining pitched roof I used Marley Moderns. At the rear of the house the pitched roof interfaces with a flat roof.
There is a 40mm gap between the bottom of the last tile and the flat roof ... which is too small for another tile but too big to ignore ... should I use lead or is there a better (cheaper / less stealable) option
Thanks
I have nearly finished building a double dormer tiled with Marley plain tiles - one of the most laborious jobs in history. For the remaining pitched roof I used Marley Moderns. At the rear of the house the pitched roof interfaces with a flat roof.
There is a 40mm gap between the bottom of the last tile and the flat roof ... which is too small for another tile but too big to ignore ... should I use lead or is there a better (cheaper / less stealable) option
Thanks