No. The battens go on the outside of the first 50mm layer and are fixed through. It just ensures continuity of insulation, tight against the wall.ah OK, so you have stud work fixed to the wall, PIR friction fitted between them then battens fitted on top of the PIR for a service voice, and thin PIR around cabling.
RE polythene, do you install this on the cold side of the insulation i.e. on the wall or the warm side (under the battens).