ok so i've replaced the rotten joist now
i'm going to be laying floor tiles on it, i'll be putting 12mm wbp plywood on top of the floor boards but while i got the floor boards up?
1. shall i reinforce the joist with noggins inbetween?
2. can i screw the floor boards down screws instead of nailing them?
i'm going to be laying floor tiles on it, i'll be putting 12mm wbp plywood on top of the floor boards but while i got the floor boards up?
1. shall i reinforce the joist with noggins inbetween?
2. can i screw the floor boards down screws instead of nailing them?