I have just finished applying my latex floor screed, it hasn't come out to bad but perfectly level it is not.
My local floor supplier does not supply lecol 5500 but said that most of the floor layers use laybond 17 for laying woodblock floor, he told me that you actually dip the bottom of the block into the glue and then position on floor.
A s my floor is not perfectly level do you think i would be better of trying to get hold of an adhesive that is applied to the floor at a depth of 3mm hence giving me more room for adjustment of the blocks,or shall i go ahead with the laybond?
cheers paul
My local floor supplier does not supply lecol 5500 but said that most of the floor layers use laybond 17 for laying woodblock floor, he told me that you actually dip the bottom of the block into the glue and then position on floor.
A s my floor is not perfectly level do you think i would be better of trying to get hold of an adhesive that is applied to the floor at a depth of 3mm hence giving me more room for adjustment of the blocks,or shall i go ahead with the laybond?
cheers paul