Laying a pad in 2 stages

It was about £500, we use the water for the plants and washing the cars and anything else I use the pressure washer for, the Mrs would never settle for an ibc stuck in the corner
 
Sponsored Links
IMG_20230616_233121.jpg


So just finished laying it, took 8 bags of ballast, 1 bag sharp sand and 1.5 bags of cement (all 20kg plastic bags)
 
We've got a big round plastic tank which holds 2500 litres. It just sits on the soil, no need for any concreting, just a bit of raking first to get it level and to remove any large stones.
It's lasted about 15 years so far.
 
So just finished laying it, took 8 bags of ballast, 1 bag sharp sand and 1.5 bags of cement (all 20kg plastic bags)

You are probably looking at about 8 x 25kg bags of ballast and two 25kg bags of cement. Mix it (well) at a ratio of 6:1 or a bit stronger if you want. I'd take one of the bags of ballast out and add a bag of sharp sand so as to make the mixes a bit more fatty and mix at say 5:1.
;)
 
Sponsored Links
IMG_20230618_155234.jpg


And there's the finished article shouldn't go anywhere this time, previously it had sunk into the tarmac slightly leaving it with a list
 

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Back
Top