I have just laid new drainage out the back of my house and have broken up the old concrete, to access. I now have an area of approx 12ft x 6ft that needs re-concreting after I cover up the new drainage. Should I use crushed hardcore and then a plastic membrane on top, and then lay the concrete? What mix would I use of cement to ballast? I also have another area that needs raising by approx 6 inches,(15ft x 6ft), it already is concrete, do I need to PVA and then pour concrete straight on?
Thanks
Thanks