Forgive me please if this has been covered on numerous occasions but I've just scrolled through a few pages and couldn't spy it so here goes...
Having built an extension with solid floors I am now at the stage when a 3 inch screed is all that remains to complete floor heights. I need to run central heating pipes to half a dozen radiators and would much prefer them to be 'buried' as opposed to visible. I am considering using either copper or plastic pipework but would be very grateful for info regarding current regs on boxing/wrapping/jointing of pipework under/through the screed.
Any help very much appreciated, thank you.
Milou22 (Paul)
Having built an extension with solid floors I am now at the stage when a 3 inch screed is all that remains to complete floor heights. I need to run central heating pipes to half a dozen radiators and would much prefer them to be 'buried' as opposed to visible. I am considering using either copper or plastic pipework but would be very grateful for info regarding current regs on boxing/wrapping/jointing of pipework under/through the screed.
Any help very much appreciated, thank you.
Milou22 (Paul)