I need an advice on laying slate tiles please?
I have ordered honed slate tiles coz I loved the look and feel of them. Now having read some bits on Internet I have found out I need to seal them, which isn't a problem at all, however we are a little shy on time. The Tiler is intending to do everything in one day (kitchen only small).
Now comes the big question - what is the sequence of events during tiling with approximate dates? Eg. Lay the floor first and let it dry before grouting? (for how long?) do the tiles need to be sealed prior to grouting? Can I seal the tiles myself before the Tiler gets in (say a say or 2 in advAnce)? What happens if the tiles are not sealed?
Thank you in advance everyone
(btw im a girl and have no idea about dyi so would be really greateful for detailed replies) I know you are gonna say my Tiler should know everything but I like to be in the know)
I have ordered honed slate tiles coz I loved the look and feel of them. Now having read some bits on Internet I have found out I need to seal them, which isn't a problem at all, however we are a little shy on time. The Tiler is intending to do everything in one day (kitchen only small).
Now comes the big question - what is the sequence of events during tiling with approximate dates? Eg. Lay the floor first and let it dry before grouting? (for how long?) do the tiles need to be sealed prior to grouting? Can I seal the tiles myself before the Tiler gets in (say a say or 2 in advAnce)? What happens if the tiles are not sealed?
Thank you in advance everyone
(btw im a girl and have no idea about dyi so would be really greateful for detailed replies) I know you are gonna say my Tiler should know everything but I like to be in the know)