Hi everyone,
We have just had our bifold doors delivered and the builder will be fitting them on Sat.
I just want to make sure that I am 100% happy with there the DPM etc all go.
Below are a few photos of the extension so far which show the dpm that’s under the slab coming up next to the opening.
Am I correct to think that this DPM will get glued down to the outer bricks, then a DPC course layed out over the top and then the door cill goes on top of this? (Sketch below of what I am trying to explain)
Also, would you have the perimeter upstand in the door opening as I have shown?
Any help would be appreciated as always!
We have just had our bifold doors delivered and the builder will be fitting them on Sat.
I just want to make sure that I am 100% happy with there the DPM etc all go.
Below are a few photos of the extension so far which show the dpm that’s under the slab coming up next to the opening.
Am I correct to think that this DPM will get glued down to the outer bricks, then a DPC course layed out over the top and then the door cill goes on top of this? (Sketch below of what I am trying to explain)
Also, would you have the perimeter upstand in the door opening as I have shown?
Any help would be appreciated as always!