hi,
hoping someone can break down the process of using pegs and string to create levels for laying a patio.
I understand i need to take account of the sub level, bedding material and the slabs. And that I need a fall so the water will drain (this is at the bottom of the garden, not by the house).
I am confused as to how to use the line? I mark out my area (square in this case) and put a peg in each corner. Then i attach the line and make level using a line level. How does that help me when digging down and to know how far i have gone and if it is level?
I obviously am missing something and could really do with an idiots guide, i.e. step-by-well-explained-step
Hope someone has the time?
cheers in advance
sam
hoping someone can break down the process of using pegs and string to create levels for laying a patio.
I understand i need to take account of the sub level, bedding material and the slabs. And that I need a fall so the water will drain (this is at the bottom of the garden, not by the house).
I am confused as to how to use the line? I mark out my area (square in this case) and put a peg in each corner. Then i attach the line and make level using a line level. How does that help me when digging down and to know how far i have gone and if it is level?
I obviously am missing something and could really do with an idiots guide, i.e. step-by-well-explained-step
Hope someone has the time?
cheers in advance
sam