- Joined
- 11 Dec 2007
- Messages
- 400
- Reaction score
- 2
- Country
About 2 years ago we read, through this forum, that this paint was good for 1st application on to new plaster.
Story short the tub was opened back then, used a bit but now an entire room & ceiling need doing.
Obviously the lid was put back on but will this still be OK to use? Just wondered about the lifespan of paint, specifically this paint.
Thanks.
Story short the tub was opened back then, used a bit but now an entire room & ceiling need doing.
Obviously the lid was put back on but will this still be OK to use? Just wondered about the lifespan of paint, specifically this paint.
Thanks.